Ace Hardware Generator

Getting business up and running after a storm is always a concern in Florida. At this distribution facility in Tampa, the customer had four goals. 1) Add whole facility generator backup power with an automatic transfer switch. 2) Incorporate the fire pump in the generator backup along with a dedicated automatic transfer switch. 3) Replace the old original switchgear with new equipment. 4) Combine the building's two services into one. 

The design team worked with the construction team throughout the whole process and the installation and outage was completed on time and in budget.

WHAT

Generator Install

WHERE

Tampa, FL

WHEN

2019